determine the vertical stress increases at z = 0, z = 2.5B

 

Vertical stress increase problem. As shown in Figure 3.27, a continuous footing is designed to support a bearing wall with load of 300 kN/m. The groundwater table is far below the ground surface. The subsoil is homogeneous silty sand with bulk unit weight of 17.5 kN/m³. The width of the wall foundation is B = 1 m, the foundation embedment depth is Df = 0.5 m. Use the following methods to determine the vertical stress increases at z = 0, z = 2.5B, and z = 5B, and calculate the average vertical stress increase in the soil layer below the center of the footing from z = 0 to 5B. Note, z starts from the bottom of the foundation.

(1) Boussinesq method.

(2) Poulos and Davis method.

(3) 2:1 method.

find the cost of your paper

Explain why attenuation is not a big problem in PET.

Consider a 2-D object consisting of two triangle compartments, as shown in Figure P9.4. Suppose a solution containing a 511 KeV gamma ray emitting radionuclide with concentration f = 0.5….

Give the mean and the variance of the reconstructed image, mean[ˆ f(x, y)] and var[ˆ f(x, y)].

Ignoring the inverse square law and attenuation, an approximate reconstruction for SPECT imaging is given by where c˜() =  {||W()} and W() is a rectangular windowing filter that cuts off at = 0…..

Find the numerical responses in each to an event in crystal C(4, 6).

Suppose a PET detector comprises four square PMTs (arranged as a 2 by 2 matrix) and a single BGO crystal with slits made in such a way that it is….