Calculate the E50 and E90 intervals.

Problem 3.10

The following data represent 60 planimeter observations of the area within a plotted traverse.

1.677 1.676 1.657 1.667 1.673 1.671 1.673 1.670 1.675 1.664 1.664 1.668 1.664 1.651 1.663 1.665 1.670 1.671 1.651 1.665 1.667 1.662 1.660 1.667 1.660 1.667 1.667 1.652 1.664 1.690 1.649 1.671 1.675 1.653 1.654 1.665 1.668 1.658 1.657 1.690 1.666 1.671 1.664 1.685 1.667 1.655 1.679 1.682 1.662 1.672 1.667 1.667 1.663 1.670 1.667 1.669 1.671 1.660 1.683 1.663

(a) Calculate the mean and standard deviation.

(b) Plot the relative frequency histogram (of residuals) for the data above using a class interval of one-half of the standard deviation.

(c) Calculate the E50 and E90 intervals.

(d) Can any observations be rejected at a 99% level of certainty?

(e) What is the peak value for the normal distribution curve, and where are the points of inflection on the curve?

find the cost of your paper

determine the context, order, and any linkages between the required elements listed below

 Demonstrate your understanding of Assembly in relation to other languages, your ability to apply existing ARM64 assembly mnemonics and techniques to a specific purpose, and to demonstrate the ability to….

Identify and write the main issues found discussed in the case (who, what, how, where and when (the critical facts in a case).

Case Study: You have just been hired to perform digital investigations and forensics analysis for a company. You find that no policies, processes, or procedures are currently in place. Conduct….

Identify dependencies between various business areas and functions.

PROJECT TITLE Business Continuity Plan for Financial Institutions ABSTRACT Due to increase in customers’ demand, competition, 24hrs continuous service, frequent changes in regulatory policy requirements and changes in various threats….